Projects
Qatar Drag Racing Club track garages and workshops.
NASCO executed all works as follows:
- Qatar Racing Club, Drainage system consists of three underground reinforced concrete tanks for water collection with concrete drainage trenches covered with ductile iron channel grating and numbers of 35 m deep soak away.
- Designing, supplying, and executing of all MEP systems, for (7) independent workshops and (25) of garages on the race track.